Saturday, February 15, 2020

Almost Ready for Paint

Starting outside, the siding is almost done.  Our contractor made the subcontractor take off much of the back siding because it was done so poorly. It looks much better.

The gutters and downspouts are installed, with a downspout visible at the far end.  That blue box below the window is for an electrical outlet.

Going inside, this is a view of the living room wall opposite the window in the picture above.  The large shallow box is for a large screen TV, and the smaller, deep box on the right for various AV components.  On the left you can see the half wall corner of the kitchen, which will hide any clutter on the counter. 

Here is a view of the sun porch with sun actually coming in, a rarity for the last several weeks of rain.  On the right side under the windows with a view out to the street are cavities which will have built-in wood bookcases.  They will be stained to match the rest of the wood trim around the doors and the deep windows. 

Looking in from the hallway is part of the bathroom.  The vanity hangs on the wall over the radiator on the left. It was the only wall where we could fit the radiator!  The toilet will be behind that, and my Jacuzzi tub is visible under the window.  Behind the wall on the right is the shower - larger than I would have liked, but that was how the spaces worked out. 

No, the walls will not be purple.

No comments: